
Company news
COMPANY NEWS
-
The leaders of the Municipal Housing and Construction Bureau visited our companyRelease time : 2023- 06-28
In order to implement the spirit of the city's economic work conference,To ensure that the city's construction industry overall recovery, stable and good development,Understand the production and operation situation of enterprises and the contradictions and difficulties they face,Help companies bail out,To help enterprises develop in a high-quality and healthy way,On the morning of June 28, 2023, Yang Xu, a member of the Party group of the Municipal Urban Construction Bureau, Fu Qingyuan, director of the building energy conservation and science and Technology Department of the Municipal Urban Construction Bureau, Cao Chuang, deputy director of the building energy conservation and science and Technology Department of the Municipal Urban Construction Bureau, visited Yuxing Construction Engineering Co., Ltd. for research and guidance,Boost the confidence of enterprises, stabilize the operation, and help the high-quality development of enterprises。
The main leaders of the company and the heads of relevant departments accompanied the investigation。
At the symposium, the leaders of the company first expressed a warm welcome to the leaders of the Housing and Construction Bureau, and thanked the leaders of the Bureau for their support in the work。Secondly, the company's development status, enterprise management, project construction, future development planning and current problems and difficulties were reported in detail。Yang Xu, a member of the Party group of the Municipal Urban Construction Bureau, and other leaders listened carefully, and sorted out and summarized the problems put forward by the enterprise, recorded in detail and conducted in-depth exchanges and discussions on the problems faced, and put forward reasonable opinions and suggestions。
Development of the company,It is inseparable from the trust and support of all customers,More inseparable from the government's attention and support,The visit and research led by the Municipal Housing Bureau,Let us have more confidence in our future development,I believe that with the support and help of the government,Yuxing Building will continue to gather strength,Overcome difficulties,Maintain a sound development situation,Achieve high-quality development of enterprises,Continue to make outstanding contributions to the city's economic and social development。 -
【365体育娱乐】Release time : 2023- 03-03
【bt365体育娱乐】
About Us: Yuxing Construction Engineering Co., Ltd. was founded in 1993,After the restructuring in 2002,Now is a collection of housing construction installation, municipal public works, decoration, steel structure, anti-corrosion insulation, urban roads and lighting, real estate development, labor subcontracting and other diversified large-scale modern enterprises,With industrial and civil construction, decoration, municipal, steel structure, anti-corrosion insulation, real estate development and other production capacity。
The registered capital of the company is 369 million yuan, the credit rating is AAA, and there are 10 branches and more than 20 project departments under the company. There are more than 410 professional management personnel of all kinds, more than 320 people with high and intermediate professional and technical titles, and more than 1600 sets of large and medium-sized machinery and equipment.。Over the years, the company has been rated as "contract-honoring enterprise", "tax-paying advanced collective Enterprise", "AAA credit Enterprise" in Henan Province, "Honest and trustworthy unit of construction project bidding enterprises in Henan Province".,It has been awarded the honorary title of "Advanced Construction Enterprise of Henan Province", "Advanced Enterprise of Construction Engineering Quality Management of Henan Province" and "Advanced Enterprise of Construction Safety of Henan Province" by the Provincial Construction Department and the Municipal Construction Commission for many times。The company has successively passed the ISO9001 quality management system, ISO14001 environmental management system, GB/T28001-OHSAS18001 occupational health and safety management system certification。
Company Qualification:The company has construction industry design Class A, construction engineering construction general contracting Class, municipal public engineering construction general contracting Class I, mechanical and electrical engineering construction general contracting Class I, highway engineering construction general contracting Class II, port and waterway engineering construction general contracting Class II, water conservancy and hydropower engineering construction general Contracting Class II, electric power engineering construction general contracting Class II, metallurgical engineering construction general contracting Class II, building decorationDecoration engineering professional contracting level 1, foundation engineering professional contracting level 1, fire protection facilities engineering professional contracting level 1, construction mechanical and electrical installation engineering professional contracting level 1, waterproof anticorrosion insulation engineering professional contracting level 1, special engineering (structural reinforcement) professional contracting level 2, formwork scaffolding professional contracting level 2, urban and road lightingCheng professional contracting level three。
In order to further better development, we are looking for the following personnel:
Project manager
Job Requirements:
1, bachelor degree or above, more than 5 years of work experience in the same position of the general contractor of construction;
2, need to hold a Grade I construction engineer certificate (double professional priority);
3, full-time, teamwork mode can be, treatment interview;
4, professional and technical personnel (mechanical professional);
Requirements for registered Design Engineer
Job Requirements:
1, bachelor degree or above, more than 5 years of work experience in the same position in a Class A design institute;
2, need to hold the relevant professional registration design certificate;
3, full-time, team mode can be, treatment interview。
Registered structural engineer
Job Requirements:
1, bachelor degree or above, more than 5 years of work experience;
2, need to hold the relevant professional registration structure certificate;
legal specialist
Job Requirements:
1. Bachelor degree or above in law, relevant work experience is preferred;
Technical workers: mechanical fitters, installation electricians, require a certain amount of relevant work experience。
Contact us:
Add: Lianbang Building (Intersection of Puji Road and Fulu Road, Zhengdong New District, Zhengzhou City, Henan Province) Tel: 0371-60110993 E-mail: hnyxja@sohu.com -
Knowledge sharing ︱ Tender production process!From the purchase of tender documents to the submission of tenders, a piece of knowledge! Release time : 2023- 07-20Regarding all aspects of tender production, I believe you have seen countless related articles on the Internet, but most of these articles have one thing in common - only for a certain part of the tender production or a certain feature to explain, and can not achieve the effect of "one article is through"。Today, Xiaobian will bring you the most complete and most detailed bidding process in history。From the purchase of bidding documents to the submission of bidding documents, the content covers how to read the bidding documents, the focus of the preparation of bidding documents, the details of attention, the key time regulations, the common preparation mistakes, the bidding techniques and the item-by-item checklist。
-
Heavy document ︱ Related to the private economy, this heavy document issued!Release time : 2023
- 07-20 7月19日
Opinions on Promoting the Development and Growth of the Private Economy
Come out with a bang
Learn about ↓
Involve a wide range of groups
Look at three data: as of the end of May, the number of registered individual industrial and commercial businesses in the country exceeded 1.The number of private enterprises exceeded 50 million, accounting for more than 92% of the total number of enterprises。
First mention: fresh force
This document makes an important statement on the positioning of the private economy。The private economy is a new force for promoting Chinese-style modernization, an important foundation for high-quality development, and an important force for building China into a great modern socialist country in an all-round way and achieving the second centenary Goal。
Li Zhaoqian, a member of the 14th National Committee of the Chinese People's Political Consultative Conference and president of the China Private Economy Research Association, said that this position directly relates private enterprises to the grand goals and tasks of Chinese-style modernization and the primary task of high quality, which highlights the important position of the private economy。
No government organ or public institution may breach or break an agreement
The document proposes to improve the government's good faith performance mechanism, establish a record and disciplinary system for government dishonesty, and incorporate the dishonest information of organs and public institutions such as breach of contract, default on accounts, and refusal to perform judicial judgments into the national credit information sharing platform。
We will improve financing support policies and systems
The document proposes to support qualified private small, medium-sized and micro enterprises to raise financing in the bond market, encourage qualified private enterprises to issue scientific and technological innovation corporate bonds, and promote the special support plan for private enterprise bond financing to expand coverage and improve credit。Support qualified private enterprises to go public for financing and refinancing。
Teng Tai, a member of the think tank of the All-China Federation of Industry and Commerce and president of the Wanbo New Economic Research Institute, said that such a policy can not only reduce the financing cost of private enterprises, but also improve the ease of financing, which is a real support for the development of private enterprises。
Prevention and settlement of arrears are listed separately
Special attention was also paid to the issue of arrears to small and medium-sized enterprises,It is proposed that organs, public institutions and large enterprises may not change their internal personnel,Implement internal payment processes,Or in the absence of a contract to wait for the completion of the acceptance of approval, final account audit, etc,Refusing or delaying payments to small and medium-sized enterprises and individual businesses。Establish a system of regular disclosure, advice and active law enforcement of arrears。Improve the complaint handling and credit supervision mechanism of delinquent accounts, and strengthen the exposure of malicious delinquent accounts。 -
Henan 2023 "everyone certificate, skill Henan" construction work plan releasedRelease time : 2023- 03-11
More than 3 million people received vocational skills training (including 1.05 million subsidized trainings), adding 2 million skilled personnel and 800,000 highly skilled personnel。(See Annex 1 and 2 for the division of tasks)
-
Knowledge sharing ︱ Application of seismic support and hanger Release time : 2023- 03-11The code for self-seismic design was introduced, and the strong article stipulates that seismic design must be carried out for building mechanical and electrical engineering in areas with seismic fortification intensity of 6 degrees and above。The construction drawing of the new project has included the seismic support and hanger in the mechanical and electrical installation project, which makes us must have a deeper understanding of the seismic support and hanger。
Knowledge Sharing ︱ [New Regulations] From March 1st, the external wall and curtain wall surface layer are included in the building area! Release time : 2023- 03-06The national standard GB55031-2022 "General Code for Civil Buildings" will be implemented from March 1!This code can be said to be the highest status, the relevant provisions of the current construction standards and this code are inconsistent, the provisions of this code shall prevail。The impact of this code on the building area is very large, according to the new regulations, from March 1st, the external wall and curtain wall surface layer are included in the building area!
Old regulation GB/T50353-2013 "Construction area calculation Code" 3.0.Excerpt from Article 27:
The following items shall not be counted as gross floor area:
……
6 Feet, attached wall columns, stacks, steps, wall plastering, decorative surface, veneer material surface layer, decorative curtain wall, air conditioning outdoor unit shelf (box), components, accessories outside the main structure, pick out the width of 2.Pillarless awnings less than 10m and pillarless awnings with a ceiling height of two floors or more。
……
Since March 1st, the new regulations have been implemented, and the rules for calculating the construction area have changed greatly!
New regulation GB55031-2022 "General Code for Civil Buildings" 3.1.1条文:
The building area shall be calculated on the basis of the horizontal projected area of the space enclosed by the outer surface of the outer envelope at each natural floor (ground) of the building。
New regulation GB55031-2022 "General Code for Civil Buildings" 3.1.1 Article description:
If "each natural floor" is a non-single-storey building, the building area shall be the sum of the areas of each natural floor of the building;
"Floor (floor) surface" means the design completion surface of the floor (floor), and for the floor without structural floor, it shall be the top surface of the concrete cushion;
"Outer protective structure" refers to the outer wall, including glass curtain wall, metal curtain wall, stone curtain wall, artificial plate curtain wall, etc., as the outer protective structure;
"Outer surface" refers to the design finish surface of the outer protective structure. The building outer protective structure is generally composed of wall, insulation layer and decorative layer. The design finish surface is the outer edge line of the decorative surface layer.When the curtain wall is used as the outer protective structure, the "outer surface" is the outer edge line of the curtain wall panel (see figure).。
The new rules, which apply to all new construction and major renovation projects, mean that more building projects are likely to be recalculated in the future, and some buildings may actually be much smaller than indicated。
So what impact will the new policy have on homeowners, homebuyers and developers?
For home buyers, they should pay more attention to the actual use area rather than the construction area。Although the calculation standard of the floor area has been updated, buyers should choose the right house according to the actual needs, and do not only value the floor area。At the same time, buyers can also ask real estate developers and agencies to understand whether the outer wall layer is included in the building area, so as to make a more accurate purchase decision。
For property owners and developers, property values need to be reassessed and the new calculation criteria adhered to。In addition, for properties that have already been purchased, owners can consider the floor area and future owners, homebuyers and developers need to pay more attention to the actual area used in order to make more accurate decisions。The calculation standard of the floor area will continue to be updated and improved in the future, and we should timely understand and adapt to the relevant policies。
In addition, in addition to the calculation of the outer wall layer, the new regulation also stipulates some other details。These details include the area of the house panel, the exposed area of the structure, the area of the balcony, and the area of the public part such as the ladder and corridor。-
[Interpretation of New Regulations] Ministry of Housing and Urban-Rural Development Order No. 57: Interpretation of the new version of the "Construction Project Quality Inspection Management Measures"!Release time : 2023-
03-06 In order to further strengthen the quality inspection management of construction projects and ensure the quality of construction projects, the Ministry of Housing and Urban-Rural Development recently issued a new version of the "Construction Project Quality Inspection Management Measures" (Ministry of Housing and Urban-Rural Development Order No. 57) (hereinafter referred to as the "Administrative Measures").。The relevant person in charge of the Engineering quality and safety Supervision Department of the Ministry of Housing and Urban and Rural Development read the "Management Measures"。
What is the background of the revised Measures?
The quality of construction projects is related to the safety of people's lives and property, the future and inheritance of the city, and the development level of new urbanization。Since the 18th National Congress of the Party,以习近平同志为核心的党中央高度重视建筑工程质量工作,We have always been people-centered,Plan to build a quality country,In particular, the Party's 20th National Congress proposed "improving the well-being of the people.,Improving the quality of people's lives",We will continue to enhance the people's sense of gain, happiness, and security。
Construction project quality inspection is an important link to control project quality, an important means of government project quality supervision, an important basis for evaluating project quality, and plays an important role in ensuring the quality of construction projects。2005年,The former Ministry of Construction issued the "Construction Project Quality Inspection Management Measures" (Ministry of Construction Order No. 141),It stipulates the qualification license, business development and supervision and management of testing activities of construction engineering quality testing institutions,It plays an important role in standardizing inspection behavior, maintaining inspection market order and ensuring engineering quality and safety。In recent years,With the continuous development of the construction market and testing industry and the gradual improvement of the people's requirements for building quality,In engineering construction, there are more and more testing items related to structural safety, functional use and new materials,Order 141 can no longer fully meet the needs of industry development and supervision,Urgent need to revise and improve。
What is the significance of the introduction of the "Administrative Measures"?
Construction engineering quality inspection is the "touchstone" of engineering quality and the "weight" of measuring engineering quality level, which plays an extremely important role in guaranteeing the quality of construction engineering。In recent years, with the rapid development of the construction industry, the construction engineering quality inspection industry has gradually grown, and the testing technical strength has gradually increased。同时,The positioning of testing institutions in the construction engineering quality testing industry does not adapt to the reality, the testing scope does not meet the actual needs of testing, the coverage of the main body of testing responsibility is incomplete, the application level of information technology in testing institutions is low, and the cost of violations is low,Some testing institutions are vicious competition and competitive price reduction,Even illegally issued false test reports,The project has buried hidden dangers in quality。The newly revised "Administrative Measures",Further strengthen the quality inspection management of construction projects from many aspects such as adjusting the scope of construction project quality inspection, strengthening the dynamic management of qualifications, standardizing construction project quality inspection activities, improving the responsibility system of construction project quality inspection, improving the level of digital application, strengthening government supervision and management, and increasing penalties for violations of laws and regulations,Maintain the market order of construction engineering quality inspection,Standardize the quality inspection behavior of construction projects,We will promote the healthy development of the construction engineering quality testing industry,Ensure the quality of construction projects。
What are the main contents of the "Administrative Measures"?
(1) Improve the connotation of construction engineering quality testing and clarify the scope of application of testing。The first is to expand the testing content to "test items involving structural safety and main functions, building materials, building components, equipment, and engineering entity quality entering the construction site" to better meet the needs of social development。The second is to further clarify the scope of application for the construction of new, expansion, reconstruction of housing construction and municipal infrastructure projects in the construction of quality testing related activities and supervision and management。
(2) Expand the types of testing market entities and strictly regulate testing behaviors。First, it is stipulated that enterprises with independent legal personality, institutions and partnerships established according to law can apply for the qualification of testing institutions, engage in relevant testing businesses according to law and regulations, enrich the types of testing market players, and meet the actual needs of the testing market。The second is to standardize the testing activities such as commissioning, sampling, marking, submitting and receiving samples during the testing process, requiring testing institutions to establish a system for recording and retaining construction process data and result data, test image data and test reports to ensure the authenticity and accuracy of test data and test reports。Third, testing institutions are required to establish and use information management systems to manage testing activities, promote the digital upgrading of construction project quality testing, and ensure that the whole process of testing activities can be traced。Fourth, testing institutions should maintain personnel, equipment, testing sites, quality assurance systems and other aspects in line with construction engineering quality testing qualification standards,Strengthen the training of testing personnel,Regular verification or calibration of instruments and equipment in accordance with relevant regulations,To ensure that the testing technical capabilities continue to meet the requirements of the construction engineering quality testing activities。Fifth, improve the responsibility system of construction engineering quality inspection, clarify the responsibilities and obligations of units and personnel involved in the construction, construction, supervision and other testing activities, and improve the relevant provisions on prohibited behaviors。
(3) Strengthen qualification management and optimize the approval process。First, according to the practical needs of construction engineering quality testing activities, the qualification of testing institutions will be modified into comprehensive qualifications and special qualifications。The second is to implement the reform requirements of "discharge service", no longer require testing institutions to provide written materials such as business licenses, technical personnel title certificates and social insurance, and change the online verification by qualification licensing authorities to reduce the burden on testing institutions。Third, the qualification certificate is an electronic certificate, and the validity period is extended from 3 years to 5 years, which is convenient for testing institutions to carry out business。The fourth is to strengthen the qualification review expert review process to ensure the professional and technical capabilities of testing institutions。The fifth is to strengthen dynamic supervision, the testing agency violations of the relevant situation into the qualification licensing conditions, requiring the testing agency to change matters affecting its compliance with the qualification standards, should be submitted to the qualification re-approval application to ensure that the testing agency continues to meet the requirements of the qualification standards。
(4) Improve the supervision mechanism and increase penalties。First, strengthen the information supervision of construction project quality testing, and stipulate that local competent departments at or above the county level establish construction project quality testing and supervision information systems to improve the level of information supervision。The second is to strengthen the control of the construction project quality testing process, and stipulate that the competent authorities should implement dynamic supervision of testing institutions and increase supervision methods such as random testing。The third is to increase the application of credit information, stipulating that after the competent authorities punish the testing institutions, the relevant units and personnel should be punished information to be made public, and the implementation of trustworthy incentives and punishments for breach of trust。Fourth, we will increase penalties for violations of laws and regulations,For example, requiring testing institutions to issue false test data or test reports,The competent department shall order correction,Be fined not less than 50,000 yuan but not more than 100,000 yuan;Causing harmful consequences,Be fined not less than 100,000 yuan but not more than 200,000 yuan;criminal,Criminal responsibility shall be investigated according to law。In the construction project seismic activities of the testing institution has the relevant behavior, in accordance with the "Construction project seismic Management Regulations" the relevant provisions shall be punished。
此外,In order to achieve the qualification standards timely adapt to the new situation, new circumstances, new requirements,Construction project quality inspection qualification standard is no longer as an annex to the "Administrative Measures",The Ministry of Housing and Urban-Rural Development will issue a separate qualification standard for testing institutions,The qualifications and reputation of the applicant, technical personnel, testing equipment and sites and other conditions and business scope shall be stipulated。
How to do a good job in implementing the "Management Measures"?
习近平总书记在党的二十大报告中强调,江山就是人民,人民就是江山,要实现好、维护好、发展好最广大人民根本利益,着力解决好人民群众急难愁盼问题,增进民生福祉,提高人民生活品质。李克强总理对2022年全国“质量月”活动作出的重要批示中指出:质量是立业之本、强国之基,事关民生福祉。All regions and relevant departments should strengthen policy guidance, further promote total quality management, implement the main responsibility, take the road of quality victory, focus on people's livelihood concerns, innovate supervision methods, adhere to "zero tolerance" for quality and safety issues, and better meet the needs of the people。When it comes to housing and urban and rural development, we will ensure that the people have better housing。All localities must resolutely integrate their thinking and actions into the decisions and arrangements of the Party Central Committee and The State Council,Let the people live in peace,Deeply understand the importance of the introduction of the "Management Measures" to promote the healthy development of construction engineering quality inspection industry, ensure the quality of construction engineering, and improve the quality of people's lives,We will earnestly implement and implement all requirements。
First, strengthen organizational leadership。It is necessary to attach great importance to the quality inspection work of construction projects, further improve the political position, improve the working mechanism, do a good job of institutional connection, ensure that the testing market is stable and orderly, and ensure the quality and safety of construction projects。
Second, we need to implement them。It is necessary to improve the construction engineering quality inspection management system according to the actual situation in the region, formulate specific implementation rules, implement it with a political and overall attitude, strengthen the supervision and inspection of construction engineering quality inspection, strengthen the governance of the construction engineering quality inspection industry, and ensure that the requirements of the "Management Measures" are implemented。
Third, we will strengthen publicity and education。It is necessary to carry out in-depth publicity and training, organize competent departments, market players, and practitioners to seriously study the spirit of the "Management Measures", improve the legal awareness, normative awareness and quality awareness of the testing industry, strengthen the guidance of public opinion, and create a good social atmosphere。
Source: China Construction News for learning and exchange only
-
[New Regulations] Construction engineering quality inspection management measures will be implemented on March 1, 2023Release time : 2023- 03-06
Measures for the Administration of quality inspection of construction projects
(Promulgated by Decree No. 57 of the Ministry of Housing and Urban-Rural Development of the People's Republic of China on December 29, 2022, effective as of March 1, 2023)
Chapter I General provisions
Article 1 These Measures are formulated in accordance with the Construction Law of the People's Republic of China, the Regulations on the Quality Control of Construction Projects, the Regulations on the Administration of Earthquake Resistance of Construction Projects and other laws and administrative regulations in order to strengthen the management of the quality control of construction projects。
Article 2 These Measures shall apply to activities related to quality testing of construction projects and their supervision and administration。
The quality testing of construction projects as mentioned in these Measures,Refers to the new, expansion, reconstruction of housing construction and municipal infrastructure engineering activities,Construction project quality testing institutions (hereinafter referred to as testing institutions) accept the commission,In accordance with relevant national laws, regulations and standards,Construction projects involving structural safety, the main function of the test items,Building materials, building components and equipment entering the construction site,And the quality of engineering entities and other testing。
Article 3 Testing institutions shall, in accordance with these Measures, obtain the qualification of construction project quality testing institutions (hereinafter referred to as the qualification of testing institutions), and engage in construction project quality testing activities within the scope of qualification approval。
Without the corresponding qualification certificate, shall not undertake the construction project quality testing business as provided for in these measures。
Article 4 The competent department of housing and urban and rural construction under The State Council shall be responsible for the supervision and administration of the quality testing activities of construction projects throughout the country。
The competent departments of housing and urban and rural construction of the local people's governments at or above the county level shall be responsible for the supervision and administration of construction project quality testing activities within their respective administrative areas and may entrust their subordinate construction project quality supervision institutions with specific implementation。
Chapter II Qualification management of testing institutions
Article 5 The qualifications of testing institutions are divided into comprehensive qualifications and special qualifications。
The qualification standards and business scope of testing institutions shall be formulated by the competent department of housing and urban and rural construction under The State Council。
Article 6 The units applying for the qualification of testing institutions shall be enterprises or institutions with independent legal personality, or partnership enterprises established according to law, and have the corresponding personnel, equipment, testing sites, quality assurance systems and other conditions。
Article 7 The competent departments of housing and urban and rural construction of the people's governments of provinces, autonomous regions and municipalities directly under the Central Government shall be responsible for the qualification and licensing of testing institutions within their respective administrative areas。
Article 8 An application for the qualification of a testing institution shall be submitted to the competent department of housing and urban and rural construction of the people's government of the province, autonomous region or municipality directly under the Central Government where the registration place is located, and the following materials shall be submitted:
(1) Application form for qualification of testing institution;
(2) List of main testing instruments and equipment;
(3) the certificate of ownership of the real estate of the test site or the lease contract;
(4) professional title certificates of technical personnel;
(5) Management system of testing institutions and quality control measures。
The application form for the qualification of testing institutions shall be formulated by the competent department of housing and urban and rural construction under The State Council。
Article 9 After accepting the application, the qualification licensing authority shall conduct material review and expert review, complete the review and make a written decision within 20 working days。For those who meet the qualification standards, the qualification certificate of the testing institution shall be issued within 10 working days from the date of making the decision, and it shall be reported to the competent department of housing and urban and rural construction under The State Council for the record。The expert evaluation time shall not be counted in the qualification license period。
Article 10 The qualification certificate of testing institutions shall be issued electronically, and the format shall be formulated by the competent department of housing and urban and rural construction under The State Council。The qualification certificate is valid for 5 years。
Article 11 If a testing institution applying for comprehensive qualification or additional qualification has acted as provided for in Article 30 of these Measures within one year prior to the date of application, the qualification licensing authority shall not approve its application。
Qualified testing institutions, in accordance with Article 35 of these measures should be rectified but has not completed the rectification, the comprehensive qualification or qualification of the application, the qualification licensing authority will not approve。
Article 12 Where a testing institution needs to extend the validity period of the qualification certificate, it shall apply to the qualification licensing authority for qualification extension 30 working days before the expiration of the validity period of the qualification certificate。
For the testing institutions that meet the qualification standards and have no conduct as prescribed in Article 30 of these Measures during the validity period of the qualification certificate, the validity period shall be extended for 5 years with the consent of the qualification licensing authority。
Article 13 If a testing institution changes its name, address, legal representative, etc. during the validity period of the qualification certificate, it shall go through the formalities for the change of the qualification certificate within 30 working days after the formalities for the change of the business license or legal person certificate。The qualification and licensing authority shall complete the process within 2 working days。
If the testing institution's testing site, technical personnel, equipment and other matters are changed to affect its compliance with the qualification standards, it shall submit an application for qualification re-approval to the qualification licensing authority within 30 working days after the change, and the qualification licensing authority shall complete the review within 20 working days and make a written decision。
Chapter III Management of detection activities
14th construction project quality testing activities, shall abide by the relevant laws, regulations and standards, the relevant personnel should have the corresponding construction project quality testing knowledge and professional ability。
Article 15 A testing institution shall not have subordination or other interest relationship with the construction, construction and supervision units related to the construction project tested, as well as the suppliers of building materials, building components and equipment。
Testing institutions and their staff shall not recommend or supervise the production of building materials, building components and equipment。
Article 16 The entrusting party shall entrust a testing institution with corresponding qualifications to carry out construction project quality testing business。Testing institutions shall conduct quality testing of construction projects in accordance with laws, regulations and standards, and issue testing reports。
Article 17 A construction unit shall reasonably calculate the cost of quality testing of a construction project when preparing the project estimate budget, and pay it separately and promptly in accordance with the contract。
Article 18 Where a construction unit entrusts a testing institution to carry out construction project quality testing activities, the construction unit or supervision unit shall witness the implementation of construction project quality testing activities。Witnesses shall make witness records, record sampling, sample preparation, marking, sealing, inspection and on-site testing, and sign for confirmation。
Article 19 Units and individuals providing test samples shall be responsible for the conformity, authenticity and representativeness of test samples。The test sample shall have a clear and unique identification and seal that is not easy to fall off。
Where a construction unit entrusts a testing institution to carry out construction project quality testing activities, construction personnel shall take samples on site under the supervision of witnesses of the construction unit or supervision unit。
Article 20 When on-site testing or testing samples are submitted for inspection, a power of attorney form shall be filled in by the unit providing the test content and the unit submitting the test。The power of attorney shall be signed and confirmed by the inspection personnel and witnesses。
When receiving the test sample, the testing institution shall check the condition, marking, sealing and other conformance of the sample, and shall not test it until it is confirmed that it is correct。
Article 21 The test report shall not take effect until it is signed by the testing personnel, the auditing personnel, the legal representative of the testing institution or the signatory authorized by the testing institution and stamped with the special seal for testing。
The test report shall include the number of test items (batches), test basis, test site address, test data, test results, witness units and names and other relevant information。
The test report issued by the testing institution not commissioned by the construction unit shall not be used as the project quality acceptance data。
22nd testing institutions shall establish construction project process data and result data, test image data and test report record and retention system, and be responsible for the authenticity and accuracy of test data and test report。
Article 23 No unit or individual may explicitly or imply that a testing institution issue a false test report, and may not tamper with or forge a test report。
Article 24 In the course of testing, testing institutions find that construction, construction and supervision units have violated relevant laws and regulations and mandatory standards for project construction,And test items involving structural safety, the main use of the function of the test results fail,The competent department of housing and urban and rural construction of the local people's government at or above the county level shall be reported in a timely manner。
Article 25 Where the interested parties of the test results have disputes over the test results, they may entrust a jointly recognized testing institution to retest。
Article 26 A testing institution shall establish a file management system。Testing contracts, orders, original records of testing data, and testing reports shall be numbered in accordance with the annual uniform number, which shall be continuous, and shall not be withdrawn or altered at will。
The testing institution shall establish a separate account of the items with unqualified test results。
27th testing institutions shall establish an information management system, testing business acceptance, testing data collection, testing information upload, testing report issuance, testing file management and other activities for information management, to ensure that the whole process of construction project quality testing activities can be traced。
Article 28 Testing institutions shall keep personnel, instruments and equipment, testing sites, quality assurance systems and other aspects in line with construction project quality testing qualification standards,Strengthen the training of testing personnel,Regular verification or calibration of instruments and equipment in accordance with relevant regulations,To ensure that the testing technical capabilities continue to meet the requirements of the construction engineering quality testing activities。
Article 29 Where a testing institution undertakes testing business across provinces, autonomous regions or municipalities directly under the Central Government, it shall file a record with the competent department of housing and urban and rural construction of the people's government of the province, autonomous region or municipality directly under the Central Government where the construction project is located。
The personnel, instruments and equipment, testing sites and quality assurance systems in the place where the testing institution undertakes the testing business shall meet the requirements for carrying out the corresponding construction project quality testing activities。
Article 30 A testing institution shall not engage in the following acts:
(1) engaging in construction project quality testing activities beyond the scope of qualification license;
(2) subcontracting or illegally subcontracting construction project quality testing services;
(3) altering, reselling, renting, lending or illegally transferring qualification certificates in other forms;
(4) testing in violation of mandatory standards for project construction;
(5) The use of testing personnel or instruments and equipment that cannot meet the requirements of the quality testing activities of the construction project;
(6) Producing false test data or test reports。
Article 31 Testing personnel shall not engage in the following acts:
(A) at the same time employed by two or more testing institutions;
(2) testing in violation of mandatory standards for project construction;
(3) producing false test data;
(D) in violation of the mandatory standards for construction conclusions or issued false conclusions。
Chapter IV Supervision and administration
Article 32 The competent departments of housing and urban and rural construction of the local people's governments at or above the county level shall strengthen the supervision and management of construction project quality testing activities, establish construction project quality testing and supervision information systems, and improve the level of information-based supervision。
Article 33 The competent departments of housing and urban and rural construction of the people's governments at or above the county level shall exercise dynamic supervision over the testing institutions and carry out supervision and inspection by means of "double random and one open"。
In carrying out supervision and inspection, they shall have the right to take the following measures:
(1) entering the construction site of a construction project or the work site of a testing institution for inspection and spot testing;
(2) to inquire and investigate the relevant situation of testing institutions, entrusting parties, relevant units and personnel;
(C) to inspect the construction project quality inspection knowledge and professional ability of the inspection personnel;
(4) consult and copy relevant test data, image data, reports, contracts and other relevant materials;
(5) To organize the implementation of capability verification or comparison tests;
(6) Other measures prescribed by laws and regulations。
Article 34 The competent departments for housing and urban and rural construction of the local people's governments at or above the county level shall strengthen the supervision and sampling of the quality of construction projects。The quality supervision and sampling test of construction projects can be implemented by the way of government purchasing services。
Article 35 Where a testing institution no longer meets the corresponding qualification standards after obtaining the qualification of a testing institution, the qualification licensing authority shall order it to make rectification within a time limit and disclose it to the public。After the testing institution completes the rectification, it shall apply to the qualification licensing authority for qualification re-approval。The test report issued before the re-verification of conformity with the qualification standards shall not be used as project quality acceptance data。
Article 36 The competent departments of housing and urban and rural construction of the local people's governments at or above the county level impose administrative penalties on testing institutions,Shall, within 20 working days from the date of delivery of the decision on administrative punishment, inform the qualification and licensing authority of the testing institution and the competent department of housing and urban and rural construction of the people's government of the province, autonomous region and municipality directly under the Central Government where the illegal act occurs。
Article 37 The competent departments of housing and urban and rural construction of the local people's governments at or above the county level shall, in accordance with the law, make public information such as the administrative penalties imposed on the relevant units and personnel of construction project quality testing activities, establish a credit management system, and implement incentives to keep faith and punishments for breaking faith。
Article 38 Any unit or individual shall have the right to file a complaint or report to the competent department of housing and urban and rural construction of the people's government at or above the county level in the place where the construction project is located in respect of any violation of laws or regulations in the quality testing activities of the construction project。
Chapter V Legal liability
Article 39 Violation of these Measures,Without obtaining the corresponding qualification, the qualification certificate has expired or exceeds the scope of qualification license to engage in construction project quality testing activities,The test report is invalid,The competent department of housing and urban and rural construction of the local people's government at or above the county level shall impose a fine of not less than 50,000 yuan but not more than 100,000 yuan;Causing harmful consequences,Be fined not less than 100,000 yuan but not more than 200,000 yuan;criminal,Criminal responsibility shall be investigated according to law。
Article 40 Where a testing institution conceals relevant information or provides false materials to apply for qualification, the qualification licensing authority shall not accept the application or refuse the administrative license, and shall give a warning;The testing institution shall not apply for qualification again within one year。
Article 41 Obtaining a qualification certificate by cheating, bribery or other improper means,The qualification licensing authority shall revoke it;The competent department of housing and urban and rural construction of the local people's government at or above the county level shall give a warning or circulate a circular of criticism,And impose a fine of not less than 50,000 yuan but not more than 100,000 yuan;The testing institution shall not apply for qualification again within 3 years;criminal,Criminal responsibility shall be investigated according to law。
Article 42 Where a testing institution fails to go through the procedures for changing the qualification certificate of a testing institution in accordance with the provisions of paragraph 1 of Article 13 of these Measures, the competent department of housing and urban and rural construction of the local people's government at or above the county level shall order it to do so within a time limit;Those who fail to do so within the time limit shall be fined not less than 5,000 yuan but not more than 10,000 yuan。
Where a testing institution fails to submit an application for re-verification of qualifications to the qualification licensing authority in accordance with the provisions of the second paragraph of Article 13 of these Measures, the competent department of housing and urban and rural construction of the local people's government at or above the county level shall order it to make corrections within a time limit;Those who fail to make corrections within the time limit shall be fined not less than 10,000 yuan but not more than 30,000 yuan。
Article 43 A testing institution violates the provisions of Article 22, Article 30, item 6 of these Measures,The competent department of housing and urban and rural construction of the local people's government at or above the county level shall order it to make corrections,Be fined not less than 50,000 yuan but not more than 100,000 yuan;Causing harmful consequences,Be fined not less than 100,000 yuan but not more than 200,000 yuan;criminal,Criminal responsibility shall be investigated according to law。
Any testing institution that commits the acts mentioned in the preceding paragraph in the seismic activities of a construction project shall be punished in accordance with the relevant provisions of the Regulations on the Administration of Seismic Activities of Construction Projects。
Article 44 A testing institution violates the provisions of these Measures,Committing any of the acts listed in items 2 to 5 of Article 30,The competent department of housing and urban and rural construction of the local people's government at or above the county level shall order it to make corrections,Be fined not less than 50,000 yuan but not more than 100,000 yuan;Causing harmful consequences,Be fined not less than 100,000 yuan but not more than 200,000 yuan;criminal,Criminal responsibility shall be investigated according to law。
If the testing personnel violate the provisions of these Measures and have one of the acts of Article 31, the competent department of housing and urban and rural construction of the local people's government at or above the county level shall order them to make corrections and impose a fine of not more than 30,000 yuan。
fortieth -
Yuxing Construction held a work conference on safety production to convey the spirit of learning and implementing the 2023 work conference on safety production in the field of urban constructionRelease time : 2023- 03-03
Contact information
Public account

Welcome to our official public account
Copyright © 2018 Yuxing Construction Engineering Co., LTD. All rights reserved Yu ICP prepared 2021003641-1 Website production:新网